Seal Village of Fishkill
The Official Site of the Village of Fishkill, New York
Search

Sewer & Water Department

The Village of Fishkill owns and maintains two separate sewer systems, one being the South Sewer Interceptor that serves the Village customers and the Town of Fishkill customers south of Fishkill Creek. The other system serves the areas of the Village north of Fishkill Creek and discharges into the Village Wastewater Treatment Facility (WWTF) located on the south end of Jackson Street.

The South Sewer Interceptor was designed to deliver customer flow from the area south of the Fishkill Creek to the WWTF through a pumping station adjacent to the Rt.-9 Bridge, over the Fishkill Creek delivering the pumped sewage to the collection system on Elm Street where it flowed by gravity to the WWTF. In the early 1980’s, the Town of Fishkill Brinkerhoff WWTF reached its useful life and the Town Officials elected to install a sewer force main along the railroad right of way and pump its wastewater to the City of Beacon’s WWTF. The Village and Town subsequently entered into a municipal agreement that allowed Village wastewater to be pumped with the Town’s wastewater to the City of Beacon WWTP.

The Jackson Street WWTF and collection system was built in the early 1970s as part of the 1972 Water Pollution Control Act that established the first nationwide program for cleaning the waterways of the United States. Over the years, the current Village facility has been incrementally improved on in an as-needed basis. In 2009 a Village WWTF upgrade and modernization is under design to meet the constantly changing regulatory requirements. Phase One upgrade was the replacement of the original pumping station located on Jackson Street with a state-of-the-art pumping facility. That upgrade allowed for an improvement in efficiency as well as the ability to handle increased volumes without increasing the footprint of the current facility.

If you require additional information or would like to report a problem, please call the Superintendant at (845) 896-8070 or to report an after-hours emergency contact the answering service at (845) 437-0016. If you have billing questions, please call Village Hall at (845)897-4430.

The Village of Fishkill water system is served by a well field owned by the Village of Fishkill that is located in the Town of Fishkill south of Interstate 84, this well field consists of nine wells of varying capacity.

The design of the Village water supply system has evolved from a surface water system that relied on gravity feed from a reservoir to a current day network of supply wells that feed into a one million gallon storage tank. The oldest in-service part of the distribution system is located south of the well field along Route 9 and is actually the remnants of the original system with a little over 1 mile of 10 in. cast iron water main.

The water mains throughout the Village system are a mixture of many different materials including, cast iron pipe, ductile iron pipe, PVC pipe and fiberglass-reinforced PVC pipe. The sizes range from 6 inches up to 20 inches in diameter.

In 2006, the Village of Fishkill undertook a major capital improvement project to improve and modernize its distribution system and to ensure a reliable flow of water to the residents and customers of the Village of Fishkill for many years to come. This project converted an old 10-inch cast iron main into a new 12-inch HDPE (high-density polyethylene pipe) water main known as the Cargill Water Main. The technology used for installing the pipe is known as “pipe bursting, trenchless technology” where the old water main provided the conduit for “pulling” the new 12” water main into place. This technology provided the Village of Fishkill with a major cost benefit when compared to conventional pipe installation techniques, and nearly zero environmental impact due to the lack of excavation required.

It should be noted that the Village of Fishkill’s supply and distribution System also provides valuable potable water to a portion of the City of Beacon, areas of the Town of Fishkill, and areas of the Town of Wappinger, through various contracts and inter-municipal agreements.

The Village of Fishkill is constantly improving and modernizing its water system as evidenced by the Cargill Main rehabilitation and the construction of our new water treatment facility during the summer of 2009.

Questions/Additional Information
To report a water problem, please call (845) 896-8070 or to report an after-hours emergency contact the answering service at (845) 437-0016.

If you have a billing question or issue, please call Village Hall (845) 897-4430. If you would like to have your Water Bill emailed, please send your email address along with your property address to the Billing Clerk – Gini@vofishkill.com (Please have the subject line read, “Email Water Bill”).

Use Your Water Sense

By making just a few small changes to your daily routine, you can save a significant amount of water, which will help you save money and preserve water resources for future generations. Water-efficient plumbing fixtures and irrigation systems provide the same performance and quality you have come to expect but with the added benefit of water savings.

Challenge: A leaky toilet can waste about 200 gallons of water every day.

Solution: To tell if your toilet leaks, place a drop of food coloring in the tank; if the color shows in the bowl without flushing, you leak.

A resident living in the Village of Fishkill could expect to pay up to $80.00 per year for a 200-gallon per day leak as discussed above.

Water/Sewer Billing Schedule & Rates

Water / Sewer Billing Schedule (pdf)

Contact Water & Sewer Billing Clerk for billing questions or for final reading requests 845-897-4430

Bill Mailing Date (unless holiday or weekend then next business day) Due Date

April 15th 1st quarter May 15th

July 15th 2nd quarter August 15th

October 15th 3rd quarter November 15th

January 15th 4th quarter February 15th

12% penalty after due date

15% penalty 30 days after due date

NOTE: FAILURE TO RECEIVE BILL DOES NOT EXCUSE NON-PAYMENT OR

RELINQUISH CUSTOMER OF LATE CHARGES

CURRENT RATES EFFECTIVE APRIL 15, 2021

 

WATER RATES

IN VILLAGE – RESIDENTIAL

Minimum Charge: $16.44 up to 1,000 cubic feet

1000 cubic feet and up $10.69 per 1000 cubic feet

OUT OF VILLAGE – RESIDENTIAL

Minimum Charge: $32.88 up to 1,000 cubic feet

1000 cubic feet and up $21.38 per 1000 cubic feet

IN VILLAGE COMMERCIAL USERS

Minimum Charge: $21.37 up to 1,000 cubic feet

1000 cubic feet and up $13.89 per 1000 cubic feet

OUT OF VILLAGE COMMERCIAL USERS

Minimum Charge: $42.74 up to 1,000 cubic feet

1000 cubic feet and up $27.78 per 1000 cubic feet

 

SEWER RATES

IN VILLAGE – RESIDENTIAL

Minimum Charge: $37.18 up to 660 cubic feet

660 cubic feet and up $5.63 per 100 cubic feet

OUT OF VILLAGE – RESIDENTIAL

Minimum Charge: $74.35 up to 660 cubic feet

660 cubic feet and up $11.27 per 100 cubic feet

IN VILLAGE COMMERCIAL USERS

Minimum Charge: $48.31 up to 660 cubic feet

660 cubic feet and up $7.32 per 100 cubic feet

OUT OF VILLAGE COMMERCIAL USERS

Minimum Charge: $96.62 up to 660 cubic feet

660 cubic feet and up $14.64 per 100 cubic feet

Helpful Links

Contact Us

Gini Ferrucci
Billing Clerk

Van Wyck Hall
1095 Main St.
Village of Fishkill NY 12524

Hours of Operation:
8 AM to 4 PM

Phone: (845) 897-4430
Fax: (845) 897-5301